Extreme Home Makeover- Main level bathroom

Hello friends!

It’s been a while since I posted an update on our home makeovers.  Our main level bathroom needed A LOT of work. They layout was awkward and there was so much wasted space that it needed a complete gut and renovation.  I wish I had taken a picture of the bathroom before we re-did it, but I didn’t so boo.

20150329_095713You can kind of see what it looked like before in that picture, but the vanity was the worst part, and I don’t have a picture of it. After the vanity was taken out, Erik and Gary wanted to move the toilet to the back wall to make the space more efficient. So they dug a huge hole in the bathroom floor.

20150329_135121and moved the toilet to the back wall

20150329_154037They ripped down all the walls and tile and put in insulation, and HEATED FLOORS.  I picked out the flooring, it is tile but looks like hardwood. I love it so much!20150426_130728They put in beadboard, which I LOVE in bathrooms, and some nice molding before finishing off the floors and installing the toilet.

20150501_20181220150520_221444We have since added a mirror to complete the look of the bathroom, but these pictures will give you a good idea of what it looks like now.

20150520_221511 20150520_221641 20150520_221619I am so in love with it and cannot wait for it to get cold so I can turn on the heated floors. MMMMMMMM

I hope everyone has a great day!

Cheers!

Thoughts?

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s